The details
Segment 2 work will take place between White Cliff and Lookout drives. While underway, all traffic will be shifted to the southbound side of Custer Parkway, with one lane open in each direction.
What else?
During construction, drivers and residents can expect several impacts, including:
- No on-street parking while active construction is underway
- Trash and recycling will continue as normal; however, if a collection point is curbside, contractors will relocate bins to a designated pick-up area
- Driveway access will be maintained unless contractors are working directly in front of a property with temporary access provided