Work intended to connect East New Hope Drive between Ronald Reagan Boulevard and Sam Bass Road in Cedar Park began in mid-October. The 1.8-mile extension began after the city
selected Austin Engineering Co. as the project’s contractor in September. Once construction is completed, the new road will be a divided four-lane roadway with a 110-foot right of way, raised medians, traffic signals, LED streetlights, bike lanes, sidewalks and stormwater controls.
- Timeline: October 2022-mid-2024
- Cost: about $30 million
- Funding sources: city of Cedar Park, Williamson County