The Texas Department of Transportation announced a series of highway lane closures as part of its I-35 Northeast Expansion project from May 27-31.

The overview

According to a press release, TxDOT will close lanes on I-35 and I-35 frontage road for roadway work, illumination repairs, barrier and drainage work, utilities work and bridge demolition work.

I-35 from FM 3009 to FM 1518
  • Three main lanes, an exit ramp, and an entrance ramp of northbound I-35 from Evans Road to Roy Richard Drive will be closed from 9 p.m.-5 a.m. on May 27-May 30 for roadway work
  • There will be project-wide rolling closures for illumination repairs from 9 p.m.-5 a.m. on May 27-30 for illumination repairs
  • The left lane of southbound I-35 from Schertz Parkway to FM 3009 will be closed until July 13 for drainage work
  • There will be a full closure of southbound I-35 frontage road, an entrance ramp and exit ramp from Schertz Parkway to Corporate Drive from 9 p.m.-5 a.m. on May 27-29 for barrier and drainage work
  • Three main lanes, an entrance ramp and exit ramp of southbound I-35 from Roy Richard Drive to Schertz Parkway will be closed from 9 p.m. to 5 a.m. on May 27-30 for column and cap work
I-35 from FM 1518 to Loop 1604
  • There will be alternating lane closures of northbound I-35 main lanes from Forum Parkway to Olympia Parkway from 9 p.m.-5 a.m. May 27-31 for utilities work
  • Three lanes of northbound I-35, an exit ramp and an entrance ramp from Forum Parkway to Evans Road will be closed from 9 p.m.-6 a.m. May 27-31 for bridge deck work
  • There will be a full closure of Corporate Drive at I-35 intersection from 9 p.m.-5 a.m. May 27-31 for bridge work
  • There will be a full closure of northbound I-35 frontage road and an exit ramp from Forum Parkway to Olympia Parkway from 9 p.m.-5 a.m. May 27-31 for cap work
  • There will be a full closure of Evans Road and northbound to southbound turnarounds at the I-35 intersection for bridge demolition work
  • There will be a full closure of the westbound Loop 1604 frontage road to northbound I-35 frontage road and the northbound I-35 connector ramp from Agora Parkway to Forum Parkway from 8 p.m.-5 a.m. May 27-31 for column and cap work
  • There will be alternating lane closures of the southbound I-35 mainlanes from Utopia Boulevard to Forum Parkway for utilities work
  • There will be a full closure on southbound I-35 frontage road and an entrance ramp from Olympia Parkway to Forum Parkway from 9 p.m.-6 a.m. May 27-31 for bridge deck work
  • There will be a full closure of the southbound I-35 frontage road from Corporate Drive to Evans Road and Evans Road at I-35 intersection from 8 p.m.-6 a.m. May 27-31 for bridge column and cap work
  • There will be a full closure of southbound I-35 frontage road from Retama Parkway to Forum Parkway from 9 p.m.-5 a.m. May 27-30 for bridge deck work
  • There will be a full closure on southbound I-35 frontage road from Forum Parkway to Gateway Boulevard, southbound I-35 collector distributor at Loop 1604 interchange and IKEA-RBFCU Parkway intersection at Loop 1604 from 9 p.m.-5 a.m. May 27-31 for bridge structure work
  • There will be a left lane closure on the northbound and southbound mainlanes of I-35 from Olympia Parkway to Arcadia Drive from 9 p.m.- 5 a.m. on May 29 for illumination repairs
  • There will be a full closure on southbound I-35 frontage road and exit ramp from Evans Road to Arcadia Drive and northbound to southbound turnaround of Evans Road at I-35 intersection from 9 p.m.-5 a.m. on May 27-30 for roadway work
  • There will be a full closure of the southbound I-35 frontage road from Forum Parkway to Gateway Boulevard from 9 p.m.-5 a.m. on May 27-31 for bridge substructure work
  • Three lanes southbound I-35 mainlanes will be closed from Schertz Parkway to Forum Parkway from 8 p.m.-5 a.m. on May 27-31 for asphalt paving
Loop 1604 Interchange
  • There will be a full closure of northbound I-35 collector distributor at the Loop 1604 interchange from 9 p.m.-5 a.m. on May 27-31 for drilled shaft work
  • There will be a full closure of the eastbound Loop 1604 collector distributor at the I-35 interchange and the southbound I-35 ramp to eastbound Loop 1604 mainlanes from 9 p.m.-5 a.m. on May 27-29 for barrier work
  • There will be a full closure on the southbound I-35 frontage road from Arcadia Drive to Olympia Parkway, entrance ramp closure at Old Austin Road, a full closure on westbound Loop 1604 mainlanes, southbound I-35 collector distributor to westbound Loop 1604 mainlanes, eastbound Loop 1604 frontage road from entrance ramp to eastbound Loop 1604 frontage road from entrance ramp to IKEA-RBFCU Parkway intersection, and IKEA-RBFCU Parkway intersection at Loop 1604 from 9 p.m.-5 a.m. May 27-31 for column, cap and bridge deck work
  • There will be a full closure on westbound Loop 1604 collector distributor at I-35 interchange, southbound I-35 collector distributor at Loop 1604 interchange, northbound and southbound I-35 ramps to westbound Loop1604 mainlanes, eastbound Loop 1604 ramp to northbound and southbound I-35 mainlanes, northbound I-35 exit ramp to Olympia Parkway, eastbound Loop 1604 frontage road from IKEA-RBFCU Parkway entrance ramp to McMorris Boulevard and IKEA-RBFCU Parkway intersection at Loop 1604 from 9 p.m.-5 a.m. May 27-31 for column, cap and bridge deck work
  • There will be a full closure on eastbound Loop 1604 frontage road at IKEA-RBFCU Parkway to southbound I-35 frontage road at Pat Booker Road, eastbound Loop 1604 ramp to southbound I-35 mainlanes and southbound I-35 collector distributor closure at the Loop 1604 interchange from 8 p.m.-6 a.m. on May 27-30 for bridge deck work
For further information on roadway closures, visit I-35 NEX project’s website.