Construction on the expansion of Shiloh Road in Plano is over 50% complete with work expected to be finished by the end of 2023.

According to a city news release, the expansion of Shiloh Road between 14th Street and Park Boulevard to a four-lane divided roadway includes several other improvements.

The details

The two-lane road is getting widened along with planned improvements to city infrastructure along the roadway.
  • Dedicated bike lanes
  • Sidewalk replacement
  • Improvements to the storm sewer system
  • Water line replacement
  • Traffic signal improvements
  • Street lights along the corridor
  • Flood plain mitigation
  • Construction of a bridge over Stream 2D8 and stabilization along the stream’s bank
Individuals can check the progress of the Shiloh Road expansion and other city road projects on the city’s website.