According to a city news release, the expansion of Shiloh Road between 14th Street and Park Boulevard to a four-lane divided roadway includes several other improvements.
The details
The two-lane road is getting widened along with planned improvements to city infrastructure along the roadway.
- Dedicated bike lanes
- Sidewalk replacement
- Improvements to the storm sewer system
- Water line replacement
- Traffic signal improvements
- Street lights along the corridor
- Flood plain mitigation
- Construction of a bridge over Stream 2D8 and stabilization along the stream’s bank