The purpose of the project is to regrade and stabilize the roadway. Work will consist of milling, paving and resurfacing the roadway and will include the installation of a two-inch asphalt base beneath two additional inches of asphalt road surface.
Timeline: spring 2021
Cost: $369,000
Funding source: city of Keller