Fast Aid Urgent Care: 229 FM 306, Bldg. A, Ste. 103, New Braunfels
Type of work: new construction
Estimated cost: $525,000
Timeline: Sept. 15-Dec. 15
Scope of work: interior finish-out
Starbucks: 2144 FM 1101, New Braunfels
Type of work: new construction
Estimated cost: $650,000
Timeline: Nov. 11, 2022-Feb. 1, 2023
Scope of work: construct Starbucks shell and site improvements; minimal electrical and plumbing included; site improvements include utilities, paving, sidewalks, parking and site signage
Villas at Barbarosa: 816 Barbarosa Road, New Braunfels
Type of work: new construction
Estimated cost: $42.74 million
Timeline: Oct. 1, 2022-Aug. 31, 2024
Scope of work: one clubhouse, pool building and 183 single-family homes for rent
Delta Echo Aviation: 2349 FM 478, New Braunfels
Type of work: new construction
Estimated cost: $1.5 million
Timeline: Sept. 1, 2022-May 31, 2023
Scope of work: a private airplane hangar with an attached office and covered patio. The office area will have offices, a waiting area, a conference room, a break area and toilet rooms
Editor’s Note: This commercial permit could not be mapped.
On The Grind: 971 FM 306, New Braunfels
Type of work: new construction
Estimated cost: $125,000
Timeline: Sept. 1-Dec. 1
Scope of work: The building is designed to be a stand-alone drive-thru coffee kiosk. No food will be served and no public access will be allowed inside the building.
New Braunfels ISD Elementary School: 4365 Klein Meadows, New Braunfels
Type of work: new construction
Estimated cost: $27 million
Timeline: Sept. 15, 2022-Feb. 6, 2024
Scope of work: a 114,456-square-foot two-story new elementary school for the New Braunfels ISD
The Dripbar: 312 Hwy. 306, Ste. 112, New Braunfels
Type of work: renovation/alteration
Estimated cost: $270,000
Timeline: Aug. 1-Oct. 31
Scope of work: this space is an existing shell that will be built out into an IV infusion lounge
FM 758 Turn Lanes: On FM 758, 0.87 miles northeast of SH 46, New Braunfels
Type of work: new construction
Estimated cost: $132,000
Timeline: Oct. 17, 2022-March 30, 2023
Scope of work: this is a roadway widening project to add turn lanes into a residential development that will be adding a pedestrian shared-use path all along the front of the development
Black Bear Diner: 4817 N. I-35, New Braunfels
Type of work: renovation/alteration
Estimated cost: $580,000
Timeline: Aug. 31-Dec. 31
Scope of work: ytenant improvement of an existing restaurant; no civil scope
Fyzical Therapy & Balance Centers: 651 N. I-35, Ste. 415, New Braunfels
Type of work: renovation/alteration
Estimated cost: $167,500
Timeline: Sept. 1-Oct. 17
Scope of work: remodel of an existing space with four new walls and two wing walls; adding in millwork in the reception/patient waiting area; also building in a kitchenette with new millwork and cabinets; using existing mechanical, electrical and plumbing throughout the remodel