CycleBar: 3620 Ranch Road 620 S., Ste. 210, Bee Cave
Type of work: renovation/alteration
Estimated cost: $200,000
Timeline: July 25, 2022-Jan. 31, 2023
Scope of work: interior tenant finish-out of an existing lease space for a cycling fitness studio, including a lobby, utility room, restrooms and a cycle theater
The Plaza at Sweetwater Crossing: 16620 Sweetwater Village Drive, Bee Cave
Type of work: new construction
Estimated cost: $8 million
Timeline: Jan. 1, 2023-Aug. 1, 2024
Scope of work: new speculative office building with a partial interior finish-out of a reinforced concrete tilt wall and conventional steel frame with site work and landscaping
Editor’s note: This commercial permit could not be mapped.
Bee Cave Elementary: 14300 Hamilton Pool Road, Bee Cave
Type of work: additions to existing building
Estimated cost: $130,000
Timeline: July 18-Aug. 12
Scope of work: addition of two temporary portable buildings and ramps outside of the existing elementary school
Riley’s Ranch Pet Spa: 15839 W. Hwy. 71, Bee Cave
Type of work: new construction
Estimated cost: $3 million
Timeline: May 2, 2022-May 1, 2023
Scope of work: new construction of an animal boarding facility
Flower Child: 4455 E. Camelback Road, Ste. B100, West Lake Hills
Type of work: renovation/alteration
Estimated cost: $900,000
Timeline: June 1-Oct. 5
Scope of work: new restaurant in a tenant remodel space
Editor’s note: This commercial permit could not be mapped.
Chick-fil-A: 701 S. Capital of Texas Hwy., Ste. L400, West Lake Hills
Type of work: renovation/alteration
Estimated cost: $500,000
Timeline: Oct. 1-Nov. 15
Scope of work: interior extension of the drive-thru cockpit area and addition of an exterior door; finish modifications and watching as required, new equipment provided, and new structural support at demolished wall
Morninglory: 2121 Lohmans Crossing, Ste. 500, Lakeway
Type of work: renovation/alteration
Estimated cost: $800,000
Timeline: Aug. 8, 2022-Jan. 31, 2023
Scope of work: renovation of restaurant space for a new restaurant tenant
Lakeway Town Center: 4218 RR 620 S., Ste. 200, Lakeway
Type of work: renovation/alteration
Estimated cost: $100,000
Timeline: Sept. 1-Dec. 1
Scope of work: nonsprinklered, open-office renovation
Swish Dental: 3944 S. FM 620, Bldg. 3, Ste. 140, Lakeway
Type of work: renovation/alteration
Estimated cost: $374,000
Timeline: May 1-Oct. 1
Scope of work: medical office interior model
Total Care Primary Care: 1945 Medical Drive, Ste. 150, Lakeway
Type of work: renovation/alteration
Estimated cost: $150,000
Timeline: May 1-Sept. 30
Scope of work: first-time interior tenant finish-out