1. Aquarena Springs Drive overpass
The Texas Department of Transportation is working to construct a bridge on Aquarena Springs Drive over the Union Pacific railroad tracks in San Marcos. Lane closures within the project area, which spans from near Charles Austin Drive to near Thorpe Lane, lasted through early April. When completed, the road will include an overpass with two travel lanes in each direction as well as two-lane access roads in each direction. Timeline: June 2015-late 2017 Cost: $20.7 million Funding sources: TxDOT
2. Post Road bridge replacement
TxDOT plans to replace the Post Road bridge over the Blanco River with a new bridge that will include 11-foot-wide travel lanes and 5-foot-wide shoulders. Timeline: TBD Cost: $1.04 million Funding sources: TxDOT
3. Goforth Road widening
Work on Goforth Road, which will be expanded to include three lanes in some areas and two lanes on some areas between I-35 and Bunton Creek Lane in Kyle, was scheduled to begin in the third week of April. Timeline: April 2016-March 2017 Cost: $6.6 million Funding sources: city of Kyle












