The Dallas-Fort Worth International Airport’s Terminal C renovations continue and a Taiwan-based company is opening a manufacturing facility in McKinney. Check out some of the latest North Texas construction filings with the Texas Department of Licensing and Regulation.
1. Lite-On manufacturing facility in McKinney
Lite-On Technology Corp., a Taiwan-based manufacturing company that specializes in semiconductor components, is moving into an existing warehouse facility in McKinney, per a TDLR filing. The move will bring at least 600 jobs to the city, per previous reporting.
- Location: 310 Cypress Hill Drive, Ste. 310, McKinney
- Estimated timeline: Sept. 15, 2026-Aug. 31, 2027
- Estimated cost: $90 million
2. MRI Equipment Replacement at Baylor Scott & White Medical Center—Plano
Officials at the Baylor Scott & White Medical Center are replacing its MRI equipment, per a TDLR filing. Equipment replacement is estimated to last four months.
- Location: 4700 Alliance Boulevard, Plano
- Estimated timeline: Nov. 16, 2026-March 31, 2027
- Estimated cost: $3 million
3. 12-unit multifamily project in Colleyville
A three-story, twelve-unit multifamily building is planned to be constructed along Colleyville’s Main Street, per a TDLR filing. The development will be located within The Village, a mixed-use commercial and residential development that saw a number of businesses open in 2025, per previous reporting.
- Location: 76 Main Street, Colleyville
- Estimated timeline: Aug. 24, 2026-Aug. 15, 2027
- Estimated cost: $2.8 million
4. Terminal C South Skylink exterior escalator and canopy
DFW Airport’s Terminal C will be reconfigured to accommodate new tenants, per a TDLR filing. The renovations are part of a larger project estimated to be finished in 2030, per previous reporting. Airport officials hosted a ribbon-cutting ceremony June 8 to open nine new gates at the terminal.
- Location: 2330 N. International Parkway, DFW Airport
- Estimated timeline: Aug. 30-2026-March 31-2027
- Estimated cost: $2 million
5. Drive-thru renovations for the Highlands at Panther Creek
A facility near FM 423 and Panther Creek is receiving interior partitions, equipment, drive thru equipment and exterior patio furniture, per a TDLR filing. The facility is part of the Highlands at Panther Creek development, which has a 25-acre retail shopping center coming soon, according to real-estate company CBRE Group’s website.
- Location: 13950 FM 423, Frisco
- Estimated timeline: March 2-May 24, 2027
- Estimated cost: $1.18 million