1. Flint Rock Road improvement project
This project will improve 2.2 miles of road between RR 620 and Serene Hills Drive in Lakeway and address safety issues, including widening lanes, improving shoulders, and changes in turns and grades. Timeline: July 1, 2015-late fall 2016 Cost: $9.2 million Funding sources: 2011 Travis County and 2012 city of Lakeway bond funds
2. Capital of Texas Hwy. resurfacing
A 4-mile stretch of North Capital of Texas Hwy. from the Colorado River to 0.25 miles south of Wild Basin Road will be resurfaced. Timeline: project to be bid in January 2017 Cost: $1.69 million Funding sources: Texas Department of Transportation
3. RR 620 intersection improvements
TxDOT plans for more than 8.5 miles of intersection improvements along RR 620 from Hwy. 71 to the Mansfield Dam. The project is designed to increase traffic efficiency and reduce travel wait times. Timeline: project to be bid in August Cost: $1.15 million Funding source: TxDOT
4. Loop 360 intersections
Intersection improvements will be made from just north of Walsh Tarlton Lane on Loop 360 to just south of MoPac. The improvements include adding auxiliary lanes on Loop 360 to improve flow through the intersections of Walsh Tarlton, the Barton Creek Square Mall entrance and MoPac. The two-year project also includes revising a future West Gate Boulevard intersection, adding a left-turn lane on the northbound frontage road of MoPac at Loop 360, replacing traffic signals and adjusting signal timing to improve efficiency. Timeline: bidding to begin in May 2016 Cost: $5.05 million Funding sources: TxDOT