Curious about which new businesses, restaurants and facilities are coming soon or underway in your backyard and beyond? Our commercial project roundup helps identify what is being built in your community. The following commercial permits have been filed recently in the Lake Travis area under the Texas Department of Licensing and Regulation. All information, including cost and timeline, is subject to change.
CycleBar: 3620 Ranch Road 620 S., Ste. 210, Bee Cave
Type of work: renovation/alteration
Estimated cost: $200,000
Timeline: July 25, 2022-Jan. 31, 2023
Scope of work: interior tenant finish-out of an existing lease space for a cycling fitness studio, including a lobby, utility room, restrooms and a cycle theater
The Plaza at Sweetwater Crossing: 16620 Sweetwater Village Drive, Bee Cave
Type of work: new construction
Estimated cost: $8 million
Timeline: Jan. 1, 2023-Aug. 1, 2024
Scope of work: new speculative office building with a partial interior finish-out of a reinforced concrete tilt wall and conventional steel frame with site work and landscaping
Editor’s note: This commercial permit could not be mapped.
Bee Cave Elementary: 14300 Hamilton Pool Road, Bee Cave
Type of work: additions to existing building
Estimated cost: $130,000
Timeline: July 18-Aug. 12
Scope of work: addition of two temporary portable buildings and ramps outside of the existing elementary school
Riley’s Ranch Pet Spa: 15839 W. Hwy. 71, Bee Cave
Type of work: new construction
Estimated cost: $3 million
Timeline: May 2, 2022-May 1, 2023
Scope of work: new construction of an animal boarding facility
Flower Child: 4455 E. Camelback Road, Ste. B100, West Lake Hills
Type of work: renovation/alteration
Estimated cost: $900,000
Timeline: June 1-Oct. 5
Scope of work: new restaurant in a tenant remodel space
Editor’s note: This commercial permit could not be mapped.
Chick-fil-A: 701 S. Capital of Texas Hwy., Ste. L400, West Lake Hills
Type of work: renovation/alteration
Estimated cost: $500,000
Timeline: Oct. 1-Nov. 15
Scope of work: interior extension of the drive-thru cockpit area and addition of an exterior door; finish modifications and watching as required, new equipment provided, and new structural support at demolished wall
Morninglory: 2121 Lohmans Crossing, Ste. 500, Lakeway
Type of work: renovation/alteration
Estimated cost: $800,000
Timeline: Aug. 8, 2022-Jan. 31, 2023
Scope of work: renovation of restaurant space for a new restaurant tenant
Lakeway Town Center: 4218 RR 620 S., Ste. 200, Lakeway
Type of work: renovation/alteration
Estimated cost: $100,000
Timeline: Sept. 1-Dec. 1
Scope of work: nonsprinklered, open-office renovation
Swish Dental: 3944 S. FM 620, Bldg. 3, Ste. 140, Lakeway
Type of work: renovation/alteration
Estimated cost: $374,000
Timeline: May 1-Oct. 1
Scope of work: medical office interior model
Total Care Primary Care: 1945 Medical Drive, Ste. 150, Lakeway
Type of work: renovation/alteration
Estimated cost: $150,000
Timeline: May 1-Sept. 30
Scope of work: first-time interior tenant finish-out