Upcoming projects
Ford Road widening (Phase 1)
Project: Planned improvements include widening the existing two-lane asphalt roadway to four lanes with a continuous turn lane between Needham Road and Ricewood Drive, and reconstructing the two-lane asphalt section from Ricewood Drive to Mills Branch Drive. This project will also signalize the intersection at Ford Road at Ricewood Drive.
Update: Utility relocation work is underway. Construction will follow Ford Road Segment 1, once the second portion of 2025 Road Bond funds have been allocated.
- Timeline: September 2025-September 2026
- Cost: $17 million
- Funding sources: Montgomery County 2025 Road Bond, Precinct 4 Commissioner’s Office, U.S. Rep. District 2 Office
Project: The two-lane asphalt road will be widened between Bentwood Channel Road and Northpark Drive to a four-lane asphalt section with turn lanes at public streets and bridge replacements.
Update: Utility relocation work is underway. The project will be advertised for construction in August 2025 upon receipt of first portion of 2025 Road Bond funds.
- Timeline: September 2025-September 2026
- Cost: $11 million
- Funding sources: Montgomery County 2025 Road Bond, Precinct 4 Commissioner’s Office
Project: The two-lane asphalt road will be widened from Hwy. 242 to 0.8 miles south of Hwy. 242 to a four-lane asphalt section with continuous turn lane, traffic signal modifications at Hwy. 242, and bridge replacement.
Update: Engineering design efforts are underway. The project is scheduled to be advertised in 2026, once the second portion of 2025 Road Bond funds have been allocated.
- Timeline: TBD
- Cost: $2 million (engineering only)
- Funding sources: Montgomery County 2025 Road Bond, Precinct 4 Commissioner’s Office