A Burlington in Kyle, a Fairfield Inn in Bastrop and an AutoZone in Austin are among the five most expensive projects filed with the Texas Department of Licensing and Regulation in the Austin metro this week.
Burlington
A new Burlington store is coming to the Kyle Park mixed-use development. The new 20,957-square-foot retail store began construction in July.
- Location: 255 Kyle Park Ave., Ste. 900, Kyle
- Estimated timeline: July 1-Sept. 1, 2027
- Estimated cost: $16.5 million
Fairfield Inn Staybridge Suites
A new 121-key hotel is coming to Bastrop, with construction set to conclude in summer 2028.
- Location: 837 SH 71, Bastrop
- Estimated timeline: Sept. 14-July 3, 2028
- Estimated cost: $10 million
Slaughter Lane Signal Improvements
This project includes installing accessible pedestrian push-buttons, pedestrian signal poles, and renovating curb ramps and adjacent sidewalks at 11 traffic signals on the Slaughter Lane corridor.
- Location: 800 Slaughter Lane to 6700 Slaughter Lane, Austin
- Estimated timeline: Nov. 30, 2026-Nov. 30, 2027
- Estimated cost: $1.2 million
AutoZone
A new AutoZone location is planned for Austin. The 6,446 square-foot auto parts store is set to begin construction in April.
- Location: 6401 E. Riverside Drive, Austin
- Estimated timeline: April 17, 2027-Sept. 16, 2027
- Estimated cost: $1.1 million
Jersey Mikes
A new Jersey Mikes is planned for Cedar Park. The 1,457 square-foot sandwich shop is expected to be completed in October.
- Location: 2301 W. Parmer Lane, Unit 204, Cedar Park
- Estimated timeline: Aug. 1-Oct. 1
- Estimated cost: $250,000