The Oak Hill Parkway project is still years away from completion with a projected start date of 2020. Staff members of the Central Texas Regional Mobility Authority, or CTRMA and the Texas Department of Transportation, or TxDOT updated Oak Hill residents on the proposed Oak Hill Parkway plan at an Oak Hill Association of Neighborhoods meeting Wednesday evening.
Lynda Rife, public involvement consultant for CTRMA, said the mobility authority has made a few changes to the project over the past few months. The project aims to improve long-term mobility at the intersection of Hwy. 290 and Hwy. 71.
[caption id="attachment_250515" align="alignright" width="460"]
Staff members of the Texas Department of Transportation and Central Texas Regional Mobility Authority updated Oak Hill residents on the Oak Hill Parkway project on June 14.[/caption]
Here are a few study and design updates made by the CTRMA:
- Draft technical studies and environmental reports prepared in anticipation of the public release of the draft Environmental Impact Statement
- Revision of some of the new technical studies to reflect additional input received from stakeholders and new information contained in the Capital Area Metropolitan Planning Organization’s [CAMPO] 2040 Plan—Due to the change in transportation demand and funding sources, CAMPO's 2035 plan is no longer active has been amended and will be amended as necessary
- Added one main lane in each direction on Hwy. 290 from Hwy. 71 to west of FM 1826 for a minimum of three lanes in each direction, and revised the alignment in the vicinity of FM 1826 to accommodate added lanes
- Located water quality ponds and vegetative filter strips along the project
- Added bus turnouts along Hwy. 290 and Hwy. 71 frontage roads
- Reduced width of Hwy. 71 and added short retaining walls to avoid some properties and trees.
- Relocated a Hwy. 71 U-turn near Williamson Creek to avoid a large oak tree
- Realigned a shared use path and sidewalks along Williamson Creek in the vicinity of William Cannon Drive and McCarthy Lane to reduce impact to trees
- Accommodated for projected 2040 traffic volumes versus 2035
- For build alternative A: lengthened the westbound frontage road bridge west of Old Bee Caves Road to reduce impacts on Williamson Creek
- For build alternative C: added signal for westbound traffic from Hwy. 290 to westbound Hwy. 71 at shared use path crossing for safety








