As the start of scheduled construction of SH 45 SW nears this summer, a group made up of citizen and conservation groups, including Save Our Springs Alliance and Friends of the Wildflower Center, filed a lawsuit Feb. 25 to halt the project and two others.
The lawsuit claims that the Texas Department of Transportation and the Central Texas Regional Mobility Authority violated federal law by splitting an overall South MoPac project into three separate ones: SH 45 SW, MoPac Intersections and the MoPac South toll lanes. The SH 45 SW project connects the southern end of MoPac to FM 1626; the MoPac Intersections project aims to improve the MoPac/Slaughter Lane and MoPac/La Crosse Avenue overpasses; and the MoPac South toll lanes are slated to be placed from Lady Bird Lake to Slaughter.
According to the lawsuit, TxDOT and the Mobility Authority have avoided taking a “hard look” at the cumulative environmental effects of the three projects as an entirety. The plaintiffs stated all three sections cross the Edwards Aquifer.
[caption id="attachment_147932" align="alignright" width="460"]
A coalition is claiming in court that the environmental effects of three proposed road projects over the Edwards Aquifer in Southwest Austin are not being examined.[/caption]
“We have strong suspicions that there are going to be fairly significant environmental degradation of the Edwards Aquifer, which would ultimately affect Barton Springs,” the plaintiffs’ attorney, Renea Hicks, said. “There would be adverse effects at the Lady Bird Johnson Wildflower Center, and it would destroy significant habitat for endangered species like the golden-cheeked warbler.”









