The Texas Department of Transportation will open the new La Crosse Avenue bridge over MoPac in the evening of April 16 and will open new MoPac main lanes underneath the bridge.
The bridge will be open to one lane of traffic in each direction as construction on the bridge’s pedestrian sidewalks is completed.
The new MoPac main lanes will allow travelers to drive north or south through the intersection without stopping at a traffic signal.
Detours have been in place for the intersection since March 2019.














