College Station officials unveiled three potential redevelopment designs and sought resident feedback on the future of the Harvey District Plan on Nov. 18.
How it happened
As previously reported by Community Impact, College Station began its first phase of the “Harvey Road Corridor Redevelopment Plan” in June. The goal of what is now known as the Harvey District Plan is to provide a comprehensive roadmap for transitioning the district into a dynamic and mixed-use area with economic growth potential, along with consideration of existing conditions and its unique needs.
The redevelopment plan has been considered since at least 2009. City Principal Planner Heather Wade told Community Impact the team wants to revitalize the 1970s-era architecture in the area.
The study is currently in phase 3, which is set to last until January 2027. Along with the open house, the team is also running working group meetings and an online scenario explorer for residents.
A closer look
Wade said after listening to the community, the team developed three hypothetical scenarios for the Harvey District and how it could change over time.
“We really want input from the community so we can see what resonates with them,” Wade said.
Wade added the input and reception from the community have been positive based on much of the team’s data collection.
“People have been very receptive to having these kinds of conversations about how the district changes,” Wade said. “We get to look at the pros and cons and ultimately develop a plan for the future.”
As previously reported by Community Impact, with areas receiving more mixed-use development, such as the Bass Pro Shops in south College Station, Wade said she is looking to have more mixed-use in certain areas.
“We are exploring more mixed-use areas in certain parts of the district,” Wade said. “They’re not recommendations, but we have done some technical work to see how things would change if certain areas had mixed-use. It is definitely something we’re considering.”
What’s next
Wade said the team will take feedback from the open house into consideration and create a preferred scenario based on the three scenarios presented.
“The goal is to have a draft plan in spring 2027 and open it up to the public for their review,” Wade said. “After that, we could then take it to the Planning and Zoning Commission and then city council.”
The city also has multiple ways for the community to give input:
Leave a public comment on a web form
Join the Harvey District Plan email list for comments and updates
Join the working group for long-term development knowledge and insight