A slate of new projects along Brays Bayou officially broke ground Jan. 28 in a ceremony led by Precinct 4 Commissioner Lesley Briones and the Houston Parks Board.
What you need to know
The projects include 4.4 miles of hike-and-bike trails, undercrossings and a memorial plaza, including:
- The installation of a 1 mile, 10-foot wide trail on the north side of Brays Bayou between Chimney Rock and Hillcroft
- An ADA-accessible trail connection to the METRO bus stops on Mullins Drive
- Four new underpasses and lower shelf trails along Brays Bayou at South Rice Avenue, Chimney Rock Road, Hillcroft Avenue, and North and South Braeswood Boulevard
- Three new underpasses at Fondren Road, Braes Bayou Drive and Bissonnet Street
- Replacement of the existing 8-inch wide asphalt trail with 10-inch wide concrete between Fondren and Braeburn Glen
The project also includes creating a new memorial plaza near Mullins Drive that will commemorate Captain Herod, a former Texas National Guard pilot who saved the lives of several residents after steering a failing jet away from homes and landing in Brays Bayou.














