Pavement repair and overlay work is being conducted along Hwy. 21 between the Caldwell County line and Hwy. 71 in Cedar Creek. The $9.5 million project is set to be completed in mid- to late summer, Texas Department of Transportation officials said.
No detour avoiding Hwy. 21 is required.
The details
The road will be covered with a thin overlay mixture to increase crack and rut resistance. Reports show a 25%-35% better ride quality and reduced road noise with the overlay mixture.














