Editor's note: This list is not comprehensive. Have a tip? Email [email protected].
Get the latest on three area transportation projects that are underway or being studied, including US 290 enhancements in northern Bastrop County, the Blakey Lane extension in the city of Bastrop and SH 95 improvements in Smithville.
Upcoming projects
1. US 290 enhancements
Project: The Central Texas Regional Mobility Authority and Texas Department of Transportation are studying the feasibility of extending tolled main lanes alongside existing non-tolled lanes, adding signalized intersections, and enhancing pedestrian and bicycle infrastructure along a 15-mile stretch of US 290 to ease congestion as the area's population continues to grow.
Update: An environmental study and schematic design are underway, with the first draft schematics expected in mid-2026, according to Mobility Authority records.
- Timeline: TBD
- Cost: TBD
- Funding sources: Central Texas Regional Mobility Authority internal funds ($21 million, feasibility and design); TBD (construction)
Ongoing projects
2. Blakey Lane extension
Project: The road will be extended from Edward Burleson Lane south to an intersection with roundabout options at Old Austin Highway.
Update: Construction began May 25, according to city records.
- Timeline: May-January 2029
- Cost: $7 million-$8 million
- Funding sources: transportation impact fees; roadway maintenance funds; water and wastewater fees
3. SH 95 improvements
Project: TxDOT is upgrading SH 95 from SL 230 to south of FM 535 in Smithville from a two-lane rural roadway to a three-lane urban roadway with a continuous left-turn lane. Improvements will include sidewalks, curb ramps, handrails and pedestrian signals.
Update: Construction began in January, according to a filing with the Texas Department of Licensing and Regulation.
- Timeline: January 2026-October 2029
- Cost: $14 million
- Funding source: TxDOT Category 2 state funds